Turf & GreensTurf & Greens overviewPutting greensIndoor putting greensDriving range tee linesBocce ball courtsArtificial lawnsPet turfPlayground turfCommercial turfThe Epic Way: how we build
Epic CourtsEpic Courts overviewPickleball courtsBasketball courtsTile courts (VersaCourt)Acrylic coated courtsBatting cages and training facilities
Epic Golf SimsGolf simulator buildsBuild your own simulatorSimulator space plannerSimulator rentals for events
Epic Turf CareTurf cleaning and repairAthletic field cleaning
Outdoor ServicesMichigan outdoor servicesHardscapingLandscapingConcrete
Service AreasAll service areasMichiganIllinoisTennesseeFloridaNaplesFort MyersCape CoralBonita SpringsEsteroSarasotaTampaOrlandoWisconsinIndianaKentucky
AboutAbout Epic Turf GroupThe Epic TeamProjectsPartners, brands and wholesaleResources
Free estimateCall 1-800-811-9868
Finished backyard putting green with a flag and white sand bunkers beside a home and patio
How we build

The Epic Way: how we build turf that lasts

What's under the turf decides how long it lasts. Here's every step of an Epic install, and how it compares with the standard build on your quote.

The Epic Way

Most of the work happens first

Turf driving range tee line with Maxx range stations set into it

We excavate fully, build a 3 to 6 inch compacted base, install bender board around the full perimeter, and only then lay the turf.

A thin or poorly compacted base is the most common reason turf ripples, sinks, puddles or lifts at the edges. Most installers use 2 to 4 inches of base. The Epic Way uses 3 to 6 inches of crushed aggregate, spread and compacted in layers into a firm, level, fast-draining foundation.

We know what holds up in Florida heat and storms and in Midwest freeze-thaw, and we design every job around it. That's what keeps turf from rippling, edges from lifting and water from puddling, so you never pay to have it redone.

Every Epic install

Eight steps, start to walkthrough

These are the steps on every lawn, pet area, playground and putting green we build, in Michigan, Illinois, Tennessee and Florida. On a putting green, step three also shapes the contours and breaks into the compacted base before any turf arrives.

You can see the result of the first four steps on your quote, because that's where Industry Standard and The Epic Standard differ: how deep we excavate, how the ground is graded, how thick the base is and how the edges are locked.

  1. Remove existing grass and soil

    We excavate the area, typically 3 to 6 inches deep, and haul off grass, roots and debris.

  2. Grade for drainage

    We shape the subgrade so water flows away from your home and does not pool.

  3. Build the base

    We spread 3 to 6 inches of crushed aggregate and compact it in layers. For putting greens, we shape contours and breaks into the base.

  4. Set the perimeter

    Bender board goes around the full perimeter to lock edges in place so they don't lift or shift.

  5. Lay and seam the turf

    We roll out the turf, cut it to fit, join the seams and secure it to the edging.

  6. Infill and brush

    Infill weighs the turf down, protects the fibers and keeps blades standing. We power brush and water it in.

  7. Final walkthrough

    We review the finished install with you and explain how to care for it.

  8. Care enrollment

    We offer the Epic Turf Care Plan to keep it looking like install day.

The Epic Way

What the cutaway shows

Read the drawing from the bottom up: graded subgrade, 3 to 6 inches of compacted aggregate, the bender board edge, then infill and turf. You see exactly where the difference in price comes from, turf origin, edging and base depth, and most customers choose The Epic Standard once they see the two side by side. The grade moves water away from the house, the base holds its shape and drains, and bender board locks the edges in place so they don't lift or shift.

On a court, the same logic applies with a court base and surface in place of turf and infill. Every quote lists the base depth, the edging and the turf origin for both builds, so you can compare them line by line before anything is ordered. See how Epic Courts are built.

  • Base3 to 6 inches of crushed aggregate, compacted in layers
  • EdgingBender board around the full perimeter
  • ExcavationFull excavation and grading so water runs away from the house
  • TurfWe use American-made turf in premium installs
  • On every quoteIndustry Standard listed next to The Epic Standard, line by line
Turf, cut and seamedInfill, power brushed3 to 6 in. compacted aggregate baseBender board, full perimeter
The Epic Way: graded subgrade, 3 to 6 inches of compacted aggregate, bender board at the edge, infill and seamed turf.
Questions

Questions about how we build

Why does base depth matter so much?

The base carries the turf, drains the water and, on a green, holds the breaks. A thin or poorly compacted base is the most common reason turf ripples, sinks, puddles or lifts at the edges. That's why The Epic Way uses 3 to 6 inches of compacted aggregate where most installers use 2 to 4.

What's bender board for?

Bender board runs around the full perimeter of the install and locks the edges in place, so the turf doesn't lift or shift along walks, beds and patios. The turf is secured to it during the install.

How does the build change between Florida and Michigan?

We design every job for its climate: Florida storms, heat and heavy rain, and Midwest freeze-thaw cycles. In both, drainage and a compacted base are what decide how long the install lasts.

Free estimate

Get a free estimate

What are you dreaming of building? Tell us, and we call back to talk through the space, your goals, timeline and budget, then set up a site visit or ask for photos by text or email.

1-800-811-9868
Call 1-800-811-9868Free estimate